 West end of Bldg. - Steel Erection. (March 2, 2005) |  West end of Bldg. - Steel Erection. (March 2, 2005) |  West end of Bldg. - Steel Erection. (March 2, 2005) |  East end of Bldg. Site - Blankets covering remaining North;
slab planned to be poured on Friday 3/4/05. (March 2, 2005) |
 Looking north, open trench (with snow) for relocation of communications duct bank. |  Looking north, open trench (with snow) for relocation of communications duct bank. |  Existing communications tie-in manhole on north side of Eniwetok (Thermally hot to touch, being impacted by leak from adjacent steam line) |  Steam outlet grate is north of hot communications manhole. |
 Open trench for relocation of 13.2 KV line looking south towards Sigma Building security fence. |  End of open trench for 13.2 KV line with Sigma Building security fence and tie-in manhole just beyond fence. |  Concrete Placement at Column Line 10. This column line is the Eastern most end of the building. (January 10, 2005) |  West end of site - Entry and Elevator Pit. (January 7, 2005) |
 East end of building - Men placing reinforcing steel in Spot Footing F13. Backhoe and Lift just west of Spot Footing F13. (January 7, 2005) |  East end of site concrete placement. Sanitary sewer for construction trailers (white/blue crane/yellow transportainer). Bottom left quadrant of photo shows spot footing F13. Left center of photo indicated column line 10 footing concrete placement. (January 7, 2005) |  View of approx. 60% of the building site from the MST OB roof. This photo with IMG_0292R.jpg covers approx. 90% of the building footprint. (January 7, 2005) |  NW End of Site from roof of MST OB - Top left quadrant of photo included building entry and elevator pit. Building entry is Column Line 1 and the Western most end of the buiding. (January 7, 2005) |
 Beginning placement of Spot Footing F11. (January 7, 2005) |  West portion of building. (January 19, 2005) |  East portion of building from MST OB roof. (January 19, 2005) |  View of most of Gateway site from MST OB roof. (January 19, 2005) |
 West portion of Site from MST OB roof. (January 19, 2005) |  East portion of Site from MST OB roof. (January 19, 2005) |  Future Gateway Site looking South - main entry at bottom right. (January 19, 2005) |  Entry and North Wall looking East. (January 19, 2005) |
 NE Corner of Bldg. looking NW. (January 19, 2005) |  Temp. Power Looking West. (February 1, 2005) |  Temp. Power Looking SW. (February 1, 2005) |  Temp. Power Looking NW. (February 1, 2005) |
 Stem/Ret. Wall SW Corner. (February 1, 2005) |  South end of Bldg. (February 1, 2005) |  East end of Site - Snow being taken off-site. (February 1, 2005) |  East portion of Site. (February 1, 2005) |
 West end of Site. (February 1, 2005) |  West end of Site. (February 17, 2005) |  Center of Site looking North. (February 17, 2005) |  East end of Site. (February 17, 2005) |
 NW Corner of Site. (February 17, 2005) |  Pouring gas cyl. storage - south end of bldg. (February 23, 2005) |  Crane looking NW. (February 23, 2005) |  West end of Site. (February 23, 2005) |
 Central portion of Site looking North. (February 23, 2005) |  East end of Bldg. (February 23, 2005) |  East end of constr. area looking NE - Constr. trlrs. behind large pine tree. (February 23, 2005) |  Plumbing/Electr. @ 4,6 & B,C - Slab for gas cyl. (February 23, 2005) |
 Crane & Steel Columns. (February 23, 2005) |  Crane from MST OB Roof. (February 23, 2005) |  Pouring North 8: thk. slab - excav. for electr. work - underslab plumbing. (February 28, 2005) |  West end of site - pouring 8" thk. slab/excav. for electr. (February 28, 2005) |
 Center of site looking North. (February 28, 2005) |  East end of Site - Concrete pumping 8" thk. North slab. (February 28, 2005) |  Pouring North 8"thk. slab. (February 28, 2005) |  Pouring North 9" thk. slab . (February 28, 2005) |
 Closeup - Pouring North 8: thk. slab. (February 28, 2005) |  Setting in/bolting steel columns. (February 28, 2005) |  Setting steel columns in place. (February 28, 2005) |  Steel delivery for placement. (February 28, 2005) |
 Completing pour of approx. 60% of North 8: thk. slab & other work looking NNE. (February 28, 2005) |  Pouring 8" thk. concrete slab @ West end. (March 9, 2005) |  8" thk. slab at West end. (March 9, 2005) |  Concrete pumping to South 8" thk. slab looking WSW. (March 9, 2005) |
 Looking straight north across the structure. (March 21, 2005) |  View to north from south side of site. (March 21, 2005) |  North but showing the first floor area. (March 21, 2005) |  Northeast view. (March 21, 2005) |
 Bar joists to be used for the ceiling. (March 21, 2005) |  The west of the site but looking east. (March 21, 2005) |  View to southeast from Eniwetok Dr. (March 21, 2005) |  View to the southwest from Eniwetok Dr. (March 21, 2005) |
 View to west from east side of site. (March 21, 2005) |  View to NW from SE corner of site. (March 21, 2005) |  A view looking northeast from the 2nd floor of the MSTOB. (March 24, 2005) |  A view looking northwest from the southeast corner of the site. (March 24, 2005) |
 A plan view drawing of the first floor. The white area represents the area to be poured tomorrow. We expect it to be in yellow next week. (March 24, 2005) |  The view looking north from the same location. Photo #5 shows a magnified view with the welders visible and working on the bar joists. (March 24, 2005) |  The big crane is slated for the move to the east side of the site next Wednesday night/Thursday morning. Following that HP will begin to set the structural steel from columns 6 - 10. |  Pouring SOG, Grid Lines 5 to 7 & B to D. (March 18, 2005) |
 West end of bldg., steel, & second flr. decking. (March 18, 2005) |  West end of bldg. (March 18, 2005) |  Pouring slab on grade (SOG), Grid Lines 5 to 7 & B to D. (March 18, 2005) |  View looking NE. (March 21, 2005) |
 SW corner of Bldg, Steel & roof bar joists. (March 21, 2005) |  Central portion of bldg. looking N. (March 21, 2005) |  Steel for East end of Bldg. on E. (March 21, 2005) |  East end of Bldg. (March 21, 2005) |
 West end of Bldg. looking N. (March 21, 2005) |  East end of Bldg. (March 24, 2005) |  Central portion of bldg. looking N from MST OB roof. (March 24, 2005) |  Central portion of bldg. looking N from MST OB roof. (March 24, 2005) |
 West end of bldg. - View looking N from MST OB roof. (March 24, 2005) |  West end of bldg. - View looking N from MST OB roof. (March 24, 2005) |  View looking NE. (March 24, 2005) |  View looking S at Main Entry. (March 24, 2005) |
 View looking SSW. (March 24, 2005) |  Prep. to pour last Slab on Grade (SOG) - Looking SE from 8" SOG, area of grid lines 3,4 and B,C. (March 24, 2005) |  Prep. to pour last SOG - SW corner of Bldg. (March 24, 2005) |  Prep. to pour last SOG - Grid lines 3,4 & B,C. (March 24, 2005) |
 View looking West. (March 24, 2005) |  SW corner of bldg. - Grid Lines 2-5 & A-C |  SW corner of bldg. - Grid Lines 2-5 & A-C |  SW corner of bldg. - Grid Lines 2-5 & A-C |
 SW corner of bldg. - Grid Lines 2-5 & A-C |  Bar joists are being installed on the ceiling area on the west side. See photo 1 for a view to the north from the 2nd floor window of the MSTOB. (March 23, 2005) |  View looking to the northeast from the same location. (March 23, 2005) |  View to the northwest from near the southeast corner of the fenced area. (March 23, 2005) |
 View to the southwest from Eniwetok Rd. (March 23, 2005) |  First floor area yet to be poured, from row A to row C, and column 2 to column 5. (March 25, 2005) |  This shows the view to the north and you can see good progress in placing the structural steel and the roof bar joists. Welding is in progress. (March 28, 2005)
|  Photo #2 shows the view from the 2nd floor window of the MSTOB, looking down at the new concrete which is 5 inches thick. (March 28, 2005) |
 This photo shows a view to the northeast. (March 28, 2005) |  There will be a limited pour today @ 1 pm on the base of the west wall--you can see some forming in photo #4.
The workers are also grouting the structural members in the little diamond shaped boxes at the mounted positions at the SOG. (March 28, 2005) |  Looking generally northwest. (March 28, 2005) |  Looking generally northwest. (March 28, 2005) |
 Looking generally northwest. (March 28, 2005) |  View looking W. (3/31/05) |  View looking NW. (3/31/05) |  Steel Erection. (3/31/05) |
 View looking NW from SE corner of MER. (3/31/05) |  Steel Erection. (3/31/05) |  Pouring Diamonds @ Columns. (3/31/05) |  View looking SW. (3/31/05) |
 View looking NNW. (3/31/05) |  View looking SW. (3/31/05) |  View looking SW. (3/31/05) |  View looking SW, NW Corner of Bldg. (3/31/05) |
 View looking SE, Main Entry. (3/31/05) |  View Looking NE. (3/31/05) |  Central portion of Bldg. (3/31/05) |  East end of bldg. and site. (3/31/05) |
 East end of site looking NE. (3/31/05) |  View looking NE. (3/31/05) |  Placing SOD gridlines 2 -4 & F to C.5. (4/15/05) |  Placing SOD gridlines 2 -4 & F to C.5. (4/15/05) |
 West end of structure - backfilling W & S ret./stem walls. (4/15/05) |  Structure looking NE -- roof decking in progress. (4/15/05) |  Structure looking S. (4/15/05) |  Structure looking WNW. (4/15/05) |
 View looking NW -- 7,D Intersection. (4/15/05) |  Columns for rock faced wall. (4/15/05) |  Structure looking SE. (4/15/05) |  Studs delivered on 4/12/04 - Approx. 50%. (4/15/05) |
 Structure looking WNW. (4/15/05) |  Structure looking NW. (4/15/05) |  Second Floor - last SOD pour. (April 29, 2005) |  Bldg. looking NE. (April 29, 2005) |
 Worker on scissor lift - installing studwall sm anchor. (April 29, 2005) |  MER looking SW. (April 29, 2005) |  First Floor - ductwork being installed - large elbows on floor. (April 29, 2005) |  Second Floor - last concrete pour. (April 29, 2005) |
 Second Floor - last pour - looking SW. (April 29, 2005) |  Mgt. Walk-Around by (L-R) C. Mangeng, ADTS; M. Strevell, PM-DO; J. Johnson, HPCC; P. Subba, HPCC; D. Chastain, PM-DO; on second floor looking SE [Thought HPCC STOP Program implemented very well]. (April 29, 2005) |  Second Floor - last pour - east end. (April 29, 2005) |  Second Floor looking NW towards main entry. (April 29, 2005) |
 Second Floor SW corner. (April 29, 2005) |  Second Floor - Looking SW. (April 29, 2005) |  Second Floor - in-slab electrical. (April 29, 2005) |  Second Floor - in-slab electrical. (April 29, 2005) |
 View looking mostly S -- most building w/two floors. (April 29, 2005) |  View from 2nd flr. MST-OB looking NE -- Note east of second floor just poured. (April 29, 2005) |  SW corner of bldg. @ MER -- Excav. for domestic water main to bldg. - Fire Water Line visible inside MER. (April 29, 2005) |  View looking N from MST-OB first floor -- West end of bldg. (April 29, 2005) |
 View looking NE from MST-OB first flr. -- Note ductwork in MER. (April 29, 2005) |  Fire Protection water line in place and tested (on left) -- main bldg. domestic water supply installed parallel to FW line (on right). (April 29, 2005) |  View looking NE -- stud progess -- excav. for domestic water main to bldg. (April 29, 2005) |  View looking SE from Eniwetok Dr. (April 29, 2005) |
 View looking S -- stone veneer wall in foreground. (April 29, 2005) |  View looking mostly S -- most building w/two floors. (April 29, 2005) |  View looking SW -- Steel stud installation in progress. (April 29, 2005) |  View looking W @ S end of building. (April 29, 2005) |
 Sidewalk just West of MST-OB ready for pour. (May 20, 2005) |  View looking NNE - Sidewalk being readied for pour. (May 20, 2005) |  View looking E. (May 20, 2005) |  View looking mostly S. (May 20, 2005) |
 View looking SE. (May 20, 2005) |  View looking SSW. (May 20, 2005) |  View looking SW. (May 20, 2005) |  View looking W. (May 20, 2005) |
 L-R: T. Taylor, MST-CINT; Jesse Johnson, HPCC; Don Rey, ADSR; Brigg Lichfield, HPCC; -- First floor looking W @ Lab area. (May 20, 2005) |  Second Floor looking E. (May 20, 2005) |  Second Floor interior looking E. (May 20, 2005) |  Second Floor West Wall looking NNW. (May 20, 2005) |
 Second Floor interior looking NE. (May 20, 2005) |  Permanent Electr. Power ductbank from MST-OB roof. (May 20, 2005) |  Permanent Electr. Power ductbank (poured today) from MST-OB roof. (May 20, 2005) |  Sheathing above Comp. Rm. looking N. (May 20, 2005) |
 View looking NE from MST-OB roof. (May 20, 2005) |  Permanent Electr. Power Ductbank poured today - temp. power at bottom of photo. (May 20, 2005) |  Domestic & Fire Protection Water ready to tie-in to LANL system - mat'ls by contr. - tie-in by KSL. (May 20, 2005) |  Main entry looking East. (June 14, 2005) |
 Reviewers near main entry on first floor between stairs and elevator. (June 1, 2005) |  Reviewers with elevator in background looking NW. (June 1, 2005) |  Reviewers with elevator in background looking NW. (June 1, 2005) |  Reviewers just outside (West of) the Gateway main entry. (June 1, 2005) |
 Reviewers just outside (West of) the Gateway main entry. (June 1, 2005) |  Forming for retaining wall between Gateway and MST-OB (See IMG_0623.JPG). (June 14, 2005) |  West side of building looking ENE. (June 14, 2005) |  Main entry looking East. (June 14, 2005) |
 Bldg. looking West. (June 14, 2005) |  Bldg. looking SE from Eniwetok (main entry). (June 14, 2005) |  Bldg. looking SE from Eniwetok. (June 14, 2005) |  Communications ductbank looking SE from building. (June 14, 2005) |
 Window installation at main entry. (June 14, 2005) |  Ductwork, piping,etc., near MER. (June 14, 2005) |  Corridor 1200D looking West. (June 14, 2005) |  Bldg. interior at NW corner looking West. (June 14, 2005) |
 N.E. corner of bldg. looking. (June 14, 2005) |  Preparation for seaming of standing seam roof. (June 14, 2005) |  Forming for retaining wall between the Gateway and the MST-OB. (June 14, 2005) |  Slab for permanent electrical transformer on S. side of buiding. (June 14, 2005) |
 Forming standing seam roofing material. (June 14, 2005) |  Roofing installation over MER. (June 14, 2005) |  Forming for retaining wall between Gateway and MST-OB/Slab for Electrical Transformer. (June 14, 2005) |  Communications Ductbank Route to manhole - transite line at lower right. (June 15, 2005) |
 SE end of building - communications line backfill and clearing of gas cylinder storage area. (June 15, 2005) |  Slab for permanent power on right - temp. power @ lower right. (June 15, 2005) |  Forming for wall between Gateway and MST-OB -- Roofing material ready for installation. (June 15, 2005) |  Standing Seam roofing material & Exhaust Stack. (June 15, 2005) |
 S.E. end of site -- Concr. Pumper for wall between CINT & MST-OB. (June 21, 2005) |  Tie-in point for building Fire Hydrant on east end of building -- taken from east MST-OB 2nd flr. window. (June 21, 2005) |  Pouring wall between CINT & MST-OB. (June 21, 2005) |  Southern area of building -- Concr. Pumper for wall between CINT & MST-OB. (June 21, 2005) |
 Wall between CINT & MST-OB -- Permanent building transformer in place. (June 21, 2005) |  Permanent CINT transformer in place. (June 21, 2005) |  Pouring wall between CINT & MST-OB. (June 21, 2005) |  Building looking NE -- Roof panels in foreground. Wall panels & stacked stone in progress. (June 30, 2005) |
 Building looking ENE -- stacked stone in progress. (June 30, 2005) |  Rear of building looking NE -- Scaffolding being placed. (June 30, 2005) |  Building looking SE. (June 30, 2005) |  Building & entry looking SE. (June 30, 2005) |
 North side of building looking SSE. (June 30, 2005) |  Standpipe for Sanitary Sewer test. (June 30, 2005) |  Trench for Communications Ductbank -- Transite pipe removed. (June 30, 2005) |  Building looking NW -- South area. (July 1, 2005) |
 Building looking NW -- East area. (July 1, 2005) |  Corridor 1200D -- Looking West. (July 1, 2005) |  Equip. Rm. -- 1st floor -- Looking W. (July 1, 2005) |  Equip. Rm. -- Looking SW. (July 1, 2005) |
 Entry -- First Floor -- Looking N. (July 1, 2005) |  Entry -- Stairway -- taken from 2nd Flr. (July 1, 2005) |  Corridor 2000A -- Looking S. Computational Graphics to the left (Rm 2301). (July 1, 2005) |  Exhaust Stack (42") in Mech. Equip. Rm. -- 2nd Flr. (July 1, 2005) |
 Mech. Equip. Rm. -- 2nd Flr. (July 1, 2005) |  Ductwork in 2nd Flr. Mech. Equip. Rm. (July 1, 2005) |  1st Flr. -- Spectroscopy/Novel Optical Scanning Probe, Rm. 1201 -- looking East. (July 1, 2005) |  Rock wall near entry at street (Eniwetok) taken from inside building looking down and to the North. (July 1, 2005) |
 Building looking West -- looking at East Wall. (July 1, 2005) |  SE end of building -- looking N -- prep. for plastering. (July 8, 2005) |  SW end of building -- looking N prep. for plastering. (July 8, 2005) |  Prep. for lifting SS roofing panels. (July 8, 2005) |
 Prep. for lifting SS roffing panels. (July 8, 2005) |  Lifting SS roofing panels. (July 8, 2005) |  Lifting SS roofing panels -- looking NNE. (July 8, 2005) |  Side Metal Panel/Stacked Stone in progress -- Prep for plastering SW corner. (July 8, 2005) |
 Lifting SS roof panels -- looking NNE. (July 8, 2005) |  Lifting Standing Seam (SS) roofing panels. (July 8, 2005) |  Building Entry looking SE - lifting SS roofing panels. (July 8, 2005) |  View of Building looking SE. (July 8, 2005) |
 View of Building looking SE. (July 8, 2005) |  Excavation for East Fire Hydrant tie-in - upper left where conduit was damaged - now covered by mud - behind PIV conduit shown. (July 18, 2005) |  Bldg. looking NW - plaster scratch coat in progress. (July 18, 2005) |  Bldg. looking W - plaster scratch coat in prgress. (July 18, 2005) |
 First Floor Corridor (1200B) looking W - Mech in progress - temp. task lighting. (July 18, 2005) |  Plaster scratch coat outside Recieving Area/Loading Dock (Rm. 1216) & outside men's bathroom - looking SSW. (July 18, 2005) |  Outdoor mtg. area - First Floor - Rm. 1130 - looking NE. (July 18, 2005) |  Manager's Office (Rm. 2117A) - Second Flr. - NW corner wall sheet rocked both sides. (July 18, 2005) |
 Corridor 1200A looking S --Door on left is to Rm. 1217 - X-Ray Diffraction or "Physical Synthesis". (July 18, 2005) |  View from second floor looking NNE - stacked stone wall at entry starting. (July 18, 2005) |  Synthesis (Rm. 2204) looking E. (July 18, 2005) |  Second Floor looking E from just North of evevator. (July 18, 2005) |
 Biochem./Molecular Biology - Rm. 2201. (July 18, 2005) |  MER looking SE. (July 18, 2005) |  Corridor 1200D looking E - Rm. 1201, Spectroscopy/Novel Optical Scanning Probe to the near right. (July 18, 2005) |  Building looking WSW, Tyvec installation nearing completion. (July 18, 2005) |
 Bldg. looking SW - metal siding, roofing, stacked stone in progress . (July 18, 2005) |  Bldg. looking SE - Metal siding, roofing, stacked stone in progress. (July 18, 2005) |  Area of East Fire Hydrant tie-in. (July 18, 2005) |  SS roof installation over first floor. (July 26, 2005) |
 Bldg. looking SW - window installation - prep. for curb & gutter. (July 26, 2005) |  Bldg. looking E at entry - discussing taxi drop-off modification. (July 26, 2005) |  Fire hydrant routing on east end of site. (July 26, 2005) |  Last of communications ductbank - Communications M.H. behind porta-potti. (July 26, 2005) |
 Fire hydrant at east end of site in progress. (July 26, 2005) |  East end of bldg. looking NNE from MST-OB roof. (July 26, 2005) |  Back center of bldg. looking North from MST-OB roof. Plastering in progress. (July 26, 2005) |  Back of bldg. looking NW from MST-OB roof. (July 26, 2005) |
 West end of bldg. from MST-OB roof. Sidewalk in place. Plastering in progress. (July 26, 2005) |  West end of second floor roofing installation. (July 26, 2005) |  Bldg. looking NE from MST-OB roof. (July 26, 2005) |  SW back wall -- Tyvec install. over MER -- scaffolding for stucco. (July 29, 2005) |
 Prep. for stuccoing SW back wall. (July 29, 2005) |  Stucco in progress on S. wall. (July 29, 2005) |  Stucco in progress on S. wall -- scaffolding being removed with progress. (July 29, 2005) |  Forming for stairs at entry. (July 29, 2005) |
 Preparation for concrete at entry -- stacked stone wall in progress. (July 29, 2005) |  Bldg. looking SE. (July 29, 2005) |  Bldg. looking SE -- Roofing in progress. (July 29, 2005) |  East end of bldg. looking SE -- Roofing in progress -- Window inst. in progress. (July 29, 2005) |
 Backfilling fire protection line at east end of site for fire hydrant -- looking SW. (July 29, 2005) |  Installation of fire hydrant -- east end of site. (July 29, 2005) |  Damaged electrical conduit from excavation for fire protection line - hydrant inst. (July 29, 2005) |  Fire hydrant water line ready for tie-in -- exist main at bottom of photo. (July 29, 2005) |
 Back of Bldg. looking NW -- stuccoing in progress. (July 29, 2005) |  Break Room/Coffe Bar/Kithenette looking W from Outdoor Meeting Area -- Bar framework in progress. (July 29, 2005) |  View looking W from Interactive Commons area (1000B) towards Corridor (1100). (July 29, 2005) |  Forming for stairs at entry. (July 29, 2005) |
 Temp. Staff Off. (1302) looking S. (July 29, 2005) |  MER (1402) looking W. (July 29, 2005) |  Second Floor looking East -- Elevator on the right. (July 29, 2005) |  NW corner of Biochemistry/Molecular Biology Lab (Rm. 2201) -- looking SE. (July 29, 2005) |
 Forming for retaining wall and stairs at entry. (July 29, 2005) |  Ductwork up from first floor to second floor at chase - looking N. (July 29, 2005) |  Prep. for drywall at stairway (2300S2) from second floor -- looking E. (July 29, 2005) |  Roof over first floor taken from Manager's Office (2117A) -- Looking SE. (July 29, 2005) |
 Roof over first floor taken from Manager's Office. (July 29, 2005) |  View looking W from Manager's Office (2117A) - N windows on right. (July 29, 2005) |  Bldg. looking SW. (July 29, 2005) |  Bldg. looking WSW. (July 29, 2005) |
 Stuccoing wall between CINT and MST-OB -- looking ENE. (July 29, 2005) |  East fire hydrant tie-in looking N -- partially covered -- thrust blocks -- gate valve on new line. (August 8, 2005) |  Damaged conduit in trench for fire hydrant water piping. (August 8, 2005) |  Back of bldg. looking NW. (August 8, 2005) |
 SE end of bldg. looking NNW. (August 8, 2005) |  Back of bldg. looking W. (August 8, 2005) |  East end of bldg. looking S. -- First floor roof in progress -- prep. for drainage on North -- Looking South. (August 8, 2005) |  NE end of bldg. -- first floor roof in progress -- Prep. for north area drainage. (August 8, 2005) |
 NW end of bldg. -- prep. for N. drainage. (August 8, 2005) |  Bldg. looking SE. (August 8, 2005) |  Entry looking E. (August 8, 2005) |  Retaining wall at entry -- Area drain ready for install. (August 8, 2005) |
 West end of bldg. looking NE. (August 8, 2005) |  Prep. for stairs and plaza at entry -- looking SE. (August 17, 2005) |  Bldg. looking SE -- stacked stone & curb & gutter installation prep. on Eniwetok Dr. (August 17, 2005) |  East end of bldg. looking NNW. (August 17, 2005) |
 South of bldg. looking W. (August 17, 2005) |  Corridor 1100 looking W -- W -- North corr. (August 17, 2005) |  Corridor 1200D - looking W - Center Corr. (August 17, 2005) |  Continuing work on stacked stone wall at entry -- looking N from stairwasy inside kkl. (August 17, 2005) |
 Prep for stairs and plaza at entry -- looking NW from second floor of Gateway. (August 17, 2005) |  Synthesis Lab -- Rm. 2204. (August 17, 2005) |  Manager's Office looking NE. (August 17, 2005) |  Eniwetok Dr. & bldg. looking W -- curb & gutter prep. (August 17, 2005) |
 1st to 2nd Flr steel panel installation - N end of bldg. looking SW. (August 17, 2005) |  Bldg. looking SE. (August 17, 2005) |  Counter in kitchenette/breakroom/coffee bar Rm. 1123. (August 31, 2005) |  Kitchenette, Rm. 1123 looking West. (August 31, 2005) |
 Corridor 1100 looking West. (August 31, 2005) |  Interactive/Commons 1100B looking W towards entrance. (August 31, 2005) |  MER looking W -- Fabricated piping on floor. (August 31, 2005) |  Shower Rm. 1316 looking South. (August 31, 2005) |
 Unisex Bathroom 1310 looking West. (August 31, 2005) |  Corridor 1300 looking West from grid line 5. (August 31, 2005) |  Ret. walls/stairs at entry looking South. (August 31, 2005) |  Curb & Gutter & sidewalk looking E on Eniwetok from entry. (August 31, 2005) |
 Curb & Gutter prep. & other work at entry looking SE. (August 31, 2005) |  Stud wall at entry on second floor near elevator looking North. (August 31, 2005) |  Door & wall at kitchenette at entry on second floor looking East. (August 31, 2005) |  Biochemistry/Molecular Biology Rm. 2201 looking SE. (August 31, 2005) |
 Outside Computer Graphics Rm. 2301 (to the left) and looking E down corridor 2300. (August 31, 2005) |  Computer Lab Server Rm. 2302 (looking SE) being used as fabrication area. (August 31, 2005) |  Air Handling Unit in MER Rm. 2402. (August 31, 2005) |  Air Handling Unit in MER Rm. 2402 looking West . (August 31, 2005) |
 Corridor 2200 looking W from corridor 2200A. (August 31, 2005) |  Trench for steam & condensate line at entry to equipment room. (August 31, 2005) |  Excavation for steam & condensate line - finishing at expansion loop. (August 31, 2005) |  Excavation for steam & condensate line - finishing at expansion loop - steam manhole at right. (August 31, 2005) |
 Bldg. & roof at W. end - finishing standing seam roofing details. (August 31, 2005) |  East end of bldg -- view of roof. (August 31, 2005) |  Steam and condensate line at entry to equipment room. (August 31, 2005) |  Steam and condensate trench - beginning sandbed - looking towards the steam manhole. (August 31, 2005) |
 Steam and condensate trench @ exp. loop -- beginning sandbed. (August 31, 2005) |  Steam and condensate trench towards steam manhole. (August 31, 2005) |  Steam and condensate trench from manhole towards MER. (August 31, 2005) |  Computational Graphics Rm. 2301. (August 30, 2005) |
 Computational Graphics Rm. 2301 looking N. (August 30, 2005) |  Excavation for steam and condensate lines - steam and condensate lines in foreground. (August 30, 2005) |  Secondary conduit hit during fire water line excavation needing to be repaired within orange fence. (August 30, 2005) |  Excavation for steam and condensate lines - Low point vault to be installed where worker in trench is. (August 30, 2005) |
 Excavation for steam and condensate lines. (August 30, 2005) |  East end of bldg. looking N. (August 30, 2005) |  Curb & Gutter prep. @ main entry - finishing roofing details. (August 30, 2005) |  Curb & Gutter prep. @ main entry. (August 30, 2005) |
 AHU in MER. (August 30, 2005) |  SWPPP needs to be addressed -- looking E just E of construction site entry. (August 31, 2005) |  Bldg. looking SW - Note curb and gutter along Eniwetok. (August 31, 2005) |  Bldg looking SE. (August 31, 2005) |
 Bldg entry looking SE. (August 31, 2005) |  East end of site looking N - prep for asphalt. (September 29, 2005) |  SE end of buildign looking N. (September 29, 2005) |  Bldg looking N - concrete work at entry. (September 29, 2005) |
 Chiller set on pad, site preop for asphalt. (September 29, 2005) |  HVAC Fans on West sidewalk. (September 30, 2005) |  West side of Bldg. looking NE. (September 30, 2005) |  Main Entry looking SE. (September 30, 2005) |
 Main Entry looking SE. (September 30, 2005) |  Bldg. looking NW - drainage trench - curb & gutter. (September 30, 2005) |  Storm drains at Eniwetok. (September 30, 2005) |  Site looking SW - curb & gutter inst. (September 30, 2005) |
 Break Rm./Coffee Bar/Kitchenette Rm. 1123 looking NNW. (September 30, 2005) |  Entry to Informal Meeting/Teleconference Rm. 1126. (September 30, 2005) |  Spectroscopy/Novel Scanning Probe Rm. 1201, looking NE, casework (purple). (September 30, 2005) |  Corridor 1200 looking E. (September 30, 2005) |
 Corridor 1200 - Doors to Loading Dock. (September 30, 2005) |  Manager's Office Rm. 2117A looking E. (September 30, 2005) |  Biochem./Molecular Biology Rm. 2201 looking SE. (September 30, 2005) |  Concrete Work at Entry. (September 30, 2005) |
 Steam Vault outside MER. (September 30, 2005) |  Gateway to Los Alamos facility site visit - Attendees: Toni Taylor, Julie Phillips, SNL; R. Stolen, SNL; J. Roberts, M. Nastasi, P. Follansbee, Michael Lilly, SNL; Tom Picraux, Richard Averitt, John Sullivan, SNL. (October 5, 2005)
|  Stubouts installed for Steam & Condensate tie-ins inside existing steam manhole. (October 5, 2005) |  Prep. for asphalt, SE side, looking NW. (October 5, 2005) |
 Prep. for asphalt between CINT and MST-OB, looking W. (October 5, 2005) |  Curb & Gutter - SE side - looking N. (October 5, 2005) |  E side of site looking SW - prep. for asphalt. (October 5, 2005) |  Curb & Gutter looking W @ Eniwetok. (October 5, 2005) |

| 
| 
| 
|

| 
| 
| 
|

| 
| 
|  Casework in Nano Fluidics/LB Thin Films (Rm. 1225). (October 31, 2005) |
 Casework & biosafety cabinet in Nano Fluidics/LB Thin Films (Rm. 1225). (October 31, 2005) |  Casework in Physical Sythesis Rm. (Rm. 1217). (October 31, 2005) |  Corridor 1200D from 1200A looking W. (October 31, 2005) |  Casework in Spectroscopy/Novel Optical Scanning Probe Rm. (Rm. 1201) - looking NW. (October 31, 2005) |
 Interactive Commons area (1100B) looking SE. (October 31, 2005) |  Break Rm./Coffee Bar (1123) looking W. (October 31, 2005) |  Kitchenette/Library (Rm. 2001). (October 31, 2005) |  Conf. Rm. (Rm. 2101) looking SE. (October 31, 2005) |
 Windows into Biochemistry/Molecular Biology (Rm. 2201). (October 31, 2005) |  Corridor (2200) looking NW from Corr. 2200A - just W of rm. 2123. (October 31, 2005) |  Computer Lab & Server Rm. (Rm. 2302). (October 31, 2005) |  NW Plaza looking NW from second floor window - landscaping in progress. (October 31, 2005) |
 Mech. Equip. Rm. (MER), First Floor looking SW, outside (at grade level) grate is opening for steam vault. (October 31, 2005) |  Entry looking SE. (October 31, 2005) |  Informal Meeting/Teleconf. Rm. 1126. |  Furniture in typical office. November 15, 2005 |
 Cabinetry in Copy/Print Rm. 1120. |  Tilework at main entry. November 15, 2005 |  Stairway at SE end of bldg. November 15, 2005 |  Furniture in Data Analysis Area 2300C looking WSW. November 15, 2005 |
 Computer Rm. 2302. November 15, 2005 |  Conf. Rm. 2101 - Divider & screen. November 15, 2005 |  Furniture in typical office. November 15, 2005 | 
|

| 
| 
| 
|

| 
| 
|  Basecourse prep. for asphalt. (October 17, 2005) |
 Hood & Casework in lab. (October 17, 2005) |  Prep for asphalt, curb & gutter. looking SW from near E. fire hydrant. (October 17, 2005) |  Bldg. looking W. (October 17, 2005) |  E. site looking SW from constr. site entry. (October 17, 2005) |
 Casework in lab. (October 17, 2005) |  Casework in lab. (October 17, 2005) |  Kitchenette/Library looking SE (Rm. 2001). (October 17, 2005) |  Raised floor in Computer Rm. (Rm. 2302). (October 17, 2005) |
 Bio/Environmental Rm. (Rm. 2207B) looking N. (October 17, 2005) |  Meeting/Congregation Area (2100B) looking W. (October 17, 2005) |  Entry looking N. (October 17, 2005) |  Bldg. looking SE. (October 17, 2005) |
 Bldg. looking SE. (October 17, 2005) |  Bldg. looking E. (October 17, 2005) |  Bldg. looking E @ Entry. (October 17, 2005) |  Entry/Plaza area looking SSE. (October 17, 2005) |
 East end of site w/asphalt primer in place. (October 31, 2005) |  Roofing w/snow stops & lightning rods - upper SE corner of roof. (October 31, 2005) |  East end of bldg. looking N. (October 31, 2005) |  West end of bldg. looking N. (October 31, 2005) |
 Plaza area at entry looking NNW - Roof of MER at right. (October 31, 2005) |  West side of entry area looking NE. (October 31, 2005) |  Entry looking NE. (October 31, 2005)
|  Entry looking E. (October 31, 2005) |
 Bldg. looking SE. (October 31, 2005) |  Bldg. looking SE. (October 31, 2005) |  Bldg. looking NW. (October 31, 2005) |  Casework in Synthesis Rm. 2204. |
 Fume hood in Synthesis Rm. 2204. November 15, 2005 |  E. end of bldg. - looking W. November 15, 2005 |  Bldg. looking NNW. November 15, 2005 |  Bldg. looking SE - landscaping along Eniwetok. November 15, 2005 |
 Entry looking ESE. November 15, 2005 |  Small curb pour @ entry plaza. |  Bldg. looking SE |  Bldg. looking SW. November 15, 2005 |
 West end of bldg. near entry - landscape trees. November 15, 2005 |  Bldg. looking N. from MST-OB - landscaping trees to right. November 15, 2005 |  Landscaping in W front of MST-OB looking towards Gateway. (November 30, 2005) |  Landscaping in W front of Gateway Bldg. - Gateway looking NE. (November 30, 2005) |
 Main Entry looking E. (November 30, 2005) |  Main Entry looking E. (November 30, 2005) |  Bldg. looking SE. (November 30, 2005) |  Bldg. looking ESE. (November 30, 2005) |
 E side of Bldg. looking W. (November 30, 2005) |  Nano Fluidics/LB Thin Films, Rm. 1225, 6' Biosafety Cabinet. (November 30, 2005) |  Self Assembly, Rm. 1221, E. wall, 6' Fume Hood. (November 30, 2005) |  Spectroscopy/Novel Optical Scan. Probe, Rm. 1201. (November 30, 2005) |
 Main Entry, first floor, looking N. (November 30, 2005) |  Admin. Support Off, 1102, looking SW. (November 30, 2005) |  Interactive Commons Area, 1100B, looking E. (November 30, 2005) |  Break Rm./Coffee Bar/Kitchenette, 1123. (November 30, 2005) |
 Entry @ 2nd flr. looking S, windows to left are to Biochemistry/Molecular Biology, Rm. 2201. (November 30, 2005) |  Please be aware that this is a DOE facility and additional access restrictions may apply. |  Conf. Rm. 2101, lookin E. (November 30, 2005) |  Mtg./Congregation Area 2100B. (November 30, 2005) |
 Typ. Off., second flr., N. (November 30, 2005) |  Manager's Office, Rm. 2117A. (November 30, 2005) |  Environmental Room (4 deg. C.), Rm. 2207B. (November 30, 2005) |  Biosafety Cabinet, Rm. 2207E, Bacteria Cell, looking NE. (November 30, 2005) |
 Synthesis, Rm. 2204. (November 30, 2005) |  Synthesis, Rm. 2204. (November 30, 2005) |  Data Analysis Area, 2300C, looking E, towards corridor 2300. (November 30, 2005) |  Triple exhaust fan connection in 2nd flr. MER to 42" bldg. exhaust stack. (November 30, 2005) |
 Finish grade gravel top between Gateway Chiller and Gateway Bldg. - Gateway electr. xfmr. behind chiller. (November 30, 2005) |  Finish grade gravel top between MST-OB and Gateway Chiller - MST-OB electr. xfmr. on left, Gatew |